Merknaam: | PHIDIX |
Modelnummer: | aangepast |
MOQ: | 10 sets |
Prijs: | Onderhandelbaar |
Betalingsvoorwaarden: | L/C,D/A,D/P,T/T |
Toeleveringsvermogen: | 888 Set/Sets per maand handgaskabel |
Universal Push-Pull 4B Control Cable Assembly | Multi-System Compatible for Truck Cranes, PTO & Hydraulic Valves
Product Description
The Push-Pull 4B Industrial Control Cable Assembly is engineered for seamless integration across diverse industrial systems, offering unmatched versatility for B2B buyers. Designed to interface with truck crane cross-link systems, hydraulic valve controls, accelerator mechanisms, and gear selection modules, this cable ensures reliable performance in demanding environments. Compatible with most control lever configurations and power take-off (PTO) units, it simplifies operations while reducing downtime. Stainless steel end rod options enhance durability and corrosion resistance for long-term use. Ideal for OEMs and industrial suppliers seeking a universal solution, the 4B assembly streamlines procurement and minimizes compatibility concerns. Optimize your equipment with a cable built for adaptability, precision, and heavy-duty performance.
Features
• Truck crane — cross link system
• In conjunction with most control lever systems
• Power take off
• Gear selection
• Hydraulic valve systems
• Accelerator systems
• Stainless steel end rod options available
OEM/ODM
Production Process
Packing and Shipping
A.Packing
Usually according to the specific size of the product to arrange the packaging, small goods are packed in cardboard boxes, large goods are packed in cardboard boxes + wooden pallets, or one-piece paper pallets, if you have special needs, please contact us, we will try our best to serve you!
cardboard boxes (small goods) |
cardboard boxes+wooden pallets (large goods) |
one-piece paper pallets (large goods) |
![]() |
![]() |
![]() |
B.Shipping
We have cooperated with the world's major logistics companies, you can choose the logistics mode that suits your needs, so that the goods can arrive within the specified time.
Logistic Company | ![]() |
![]() |
![]() |
![]() |
![]() |
Mode of Transportation | Land, sea and air transportation |
C.Payment Methods
![]() |
![]() |
![]() |
![]() |
![]() |
E-Checkin.g |
Note:If you need another payment method, please contact us.
About us
Your Professional Control Cable Manufacturer!
Phidix Motion Controls (PMC) started the business in 2004,CMC Provides a diverse range of high-end drive control products and engineered solutions. The product line includes various sizes of control flex shafts, cab units and a range of standard parts for a wide range of high-end industrial customer markets.
Why choose us | |
Patent Certificate |
Reasonable Prices |
The company's products have passed the IATF16949 patent certificate, which ensures the quality of the products. |
High quality + factory price + fast response+reliable service is what we try our best to provide for you. |
Rapid Delivery |
ODM/OEM |
We have all the styles you need in stock and can deliver on short notice. |
When you make a request, our engineers provide you with a faster and better solution based on your needs. |
FAQ
Q: How do you design control cables?
A: We must first understand your application and must consider many factors, such as length, outside diameter, working input force, maximum input force, travel, housing material, requirements for the wire rope, material of the terminal fittings (carbon steel or stainless steel), etc.
Q: How do I place my order?
A: We produce according to the specifications, drawings or samples provided by the customer.
Q: Is the quality of your product good? How can I trust you?
A: We are a professional manufacturer of wire assemblies with more than 10 years of production experience in China. We have been providing first-class service and quality products to make our customers successful. Please contact our sales department and let us know what we can do for you, trust us, we won't let you down.
Q: What is the lead time for my order?
A: This depends a lot on the size of your order. Usually 15 days. If you need it urgently, we will do our best to fulfill your request.